top of page


Deepwater Hybrid Solar Farm
ib vogt Development Australia is proposing to develop a 120MW (AC) Hybrid solar farm across an approximately 1,000-acre site about 47 kilometres north of Glen Innes, NSW
-
The Deepwater Hybrid Solar Farm would co-exist on rural land which would continue to be used for sheep grazing.
-
The proposed solar farm would include solar arrays, a 120MW 4 hour battery, and a substation to connect into the existing 132kV transmission line that runs through the property.
-
No additional transmission lines will be required to support the project.
-
The project is currently preparing the Development Application, including all relevant expert studies and surveys, as well as the connection application process with Transgrid.
-
It is anticipated that relevant approvals will be obtained in 2027

Find out more
bottom of page